English Languages

Change Language close


EN EN FR FR DE DE ES ES IT IT NL NL PT PT RU RU
« Back to Search

Santos Arch Studio

ok Select your Dates to check availability

cal

From
£1,193 GBP | $1,610 USD

Type: Apartment
Size: 45 m2
Lease Term: Monthly
Maximum Stay: 6 month(s)
Minimum Stay: 1 month(s)
Bedrooms: 1
Bathrooms: 1
Utilities: Included

ac Air Conditioning
Continue to Reserve
No Payment until Owner Confirms.
Listing by: Flatio
email StayProtection for Guests

close
email Covered by StayProtection.

Move-in Guarantee
Ensuring you'll always have a place to stay, even if everything doesn't go as planned.
Balanced visa-friendly lease agreement
Providing equal rights and adding great flexibility to your stay.
100% money protection
Which guarantees your transactions are always secure and free from scams.

You're automatically covered by our
StayProtection package.

Santos Arch Studio

A renovated studio in the prestigious Lapa, one of the city's most emblematic areas. Located just a few meters from the riverside and Santos area, it is strategically positioned to explore the charms of Lisbon.
Equipped with air conditioning, it provides comfort throughout the year, along with all modern amenities. For wine enthusiasts who cannot resist a good bottle of the famous national production, a wine fridge will be available to ensure the ideal temperature!
*Ongoing construction works in the adjacent building with no timetable for completion.
- Building
A compact studio, yet equipped with everything you need, located on the ground floor of a historic building in one of Lisbon's most historic, noble, and emblematic areas - Lapa, where a large number of palaces and embassies are located.
The studio has independent access to the street, and thus, please note that it opens directly onto the street.
Being a street with considerable movement and traffic, exterior noise is expected. However, both the door and the window are soundproofed to increase your comfort!
With heated floors, thermal insulation throughout the property, and air conditioning, thermal comfort is assured at any time of the year.
- Living Area
Comprising a comfortable sofa, air conditioning, TV, and Sound Bar, it is illuminated by the window and glass door. We emphasize that this is the only window in the apartment, so it is important to ventilate the studio frequently during your stay.
The living area is complemented by a dining table for two and a fully equipped kitchenette.
- Kitchenette
Fully equipped with a refrigerator, oven, 4-burner electric stove, Nespresso coffee machine (coffee not included), and a wine cellar!
- Bathroom
It features an indoor bathroom with a toilet, sink, and washer-dryer.
- Sleeping Area
Adorned by a magnificent stone arch and tile, highlighting the architectural history of the building and the city of Lisbon, is the sleeping area (interior) with a double bed, air conditioning, TV, and a wardrobe space, allowing you to store and organize your belongings.
You'll also find a comfortable and modern shower here.
To prevent moisture accumulation due to baths, a dehumidifier is located in this area (complemented by the air conditioning).

Additional Information:
* The property is Self-Catered. Complimentary basic items are provided for your arrival, including first-day toiletries, toilet paper, etc. These items are offered on a welcome basis only - replacements or re-fills are not provided.
* Bed and bath linen are provided according to the number of guests confirmed in the reservation. For stays longer than 7 nights, additional bed and bath linen will be provided for free at the check-in.
* The Cleaning Fee included in your reservation covers the check-out cleaning only. Extra cleanings or fresh linens can be requested during your stay and are subject to an extra fee - these requests must be done with at least 24 hours in advance.
* Check-in time starts at 14:00 and check-out must be done until 11am.
* Crib and baby chair are available upon request and subject to an extra fee.
* City Tax will be charged according to the law, for the first 7 nights.
* The property is equipped with noise decibel monitoring sensors. This system performs advanced analysis while ensuring the privacy of our guests, as no cameras are used, and no sound is recorded. Only noise levels are measured, thus guaranteeing the tranquility and comfort of everyone during their stay.
Please contact us for more information.
email Translate

close
Notes:
Lease agreement included
All bills included
Deposit for stays over 6 months: 1395.00 (EUR)
No Deposit for stays of less than 6 months!
If you cancel your booking 30 days or more before the move-in date, you`ll get a refund of the entire first rent.
If you cancel your booking up to 14 days before the move-in date, you`ll get a refund of half of the first rent.
If you cancel your booking less than 13 days before the move-in date, you won`t get a refund of the first rent.
ok Select your Dates to check availability

cal


Contact Owner
email How do I book?
Contact the Landlord to check availability and to ask any questions you may have. Once the host confirms, you can complete your booking.

Map / Location
Details:
Location:
Street: Rua Presidente Arriaga 52
City: Lisbon
Area: Grande Lisboa
Region: Lisboa-Tagus Valley
Country: Portugal
Main Features:
Size: 45 m2
Max/Guests up to: 2
Airconditioning: check
Television: check
Local Amenities:
Kitchen:
Washing Machine: check
Fridge: check
Freezer: check
Exterior:
Availability Calendar: booked Booked Available Available
Related Searches:
Lisbon Apartments for rent | Lisbon Student Apartments for rent | Lisbon Cheap Apartments for rent | 1 bed Apartments for rent in Lisbon |
Similar Listings
    Portugal furnished Apartment in Lisboa-Tagus Valley, Lisbon

Lisbon
Apartment
Bedrooms: 1
€ 2,100/month
    Portugal furnished Apartment in Lisboa-Tagus Valley, Lisbon

Lisbon
Apartment
Bedrooms: 1
€ 1,765/month
    Portugal furnished Apartment in Lisboa-Tagus Valley, Lisbon

Lisbon
Apartment
Studio
€ 1,200/month
    Portugal furnished Apartment in Lisboa-Tagus Valley, Lisbon

Lisbon
Apartment
Bedrooms: 2
€ 2,590/month